What this topic covers
The Controls subject area of the PSI bulletin: general controls, pressure and safety controls, and temperature controls. These are original practice notes, not materials of the TDLR or PSI. The Texas rule on control wiring is described from 16 TAC Chapter 75 as in force on January 1, 2027; the technical content uses standard principles of the trade. The exam is open book: know where to look in your allowed references and what to calculate, rather than memorizing values.
General controls
- Contactor: a relay-type switch in which a small control coil, usually 24 volts, closes heavier contacts that carry the compressor line-voltage current.
- Control transformer: reduces line voltage to 24 volts. Secondary current (A) = VA / secondary volts; a 40 VA transformer at 24 V gives 40 / 24 = 1.67 A. Dividing by the 120-volt primary gives the primary current instead.
- Other parts: a capacitor stores energy for motor torque; a high-pressure switch senses discharge pressure.
- Heat pump changeover: an O output energizes the reversing valve coil in cooling, a B output in heating. A valve that needs O but is set to B stays in its heating position on a call for cooling, while compressor and fans still run.
Forced-air furnace sequence (described in words)
- Call for heat: the 24-volt circuit starts the inducer; the board waits for the inducer pressure switch to close and prove draft, then energizes the ignitor and gas valve.
- Pressure switch stays open: the sequence stops after the inducer starts. A failed transformer would prevent the call for heat and the inducer start altogether.
- Flame rectification: the board proves flame by a small rectified current through the flame sensor. A sensor coated with oxide cannot carry it, so the gas valve closes after the ignition trial; a burned-out ignitor prevents lighting instead.
Pressure and safety controls
- High-pressure switch: protects the compressor and system from excessive discharge pressure. A safety control (high-pressure, low-pressure, oil safety, limit, rollout, inducer pressure switch) is not bypassed in normal operation; find and correct the cause, for example by checking the condenser coil and fan, the system pressures and the charge.
- Pump-down cycle: the thermostat closes the liquid-line solenoid valve; the compressor runs until falling suction pressure opens the low-pressure switch, leaving the charge in the condenser and receiver.
- Leaking solenoid: refrigerant bleeds into the evaporator, suction pressure rises above the low-pressure switch cut-in, and the compressor short cycles.
Temperature controls and defrost
- Differential: the difference between cut-in and cut-out. In cooling the compressor cuts in at the warmer temperature, so cut-out = cut-in - differential (41 - 6 = 35°F).
- Off-cycle defrost: on coolers, box air above 32°F melts the frost while the compressor is off.
- Electric and hot-gas defrost: heaters on the coil, or compressor discharge vapor routed through the evaporator. A crankcase heater warms the oil to limit refrigerant migration; it is not a defrost method.
- Fan delay: by time or coil temperature, keeps evaporator fans off after defrost until water left on the coil freezes, so droplets are not blown into the box.
Texas rule on control wiring
- Control wiring: a licensee may install and service control wiring of 50 volts or less (16 TAC §75.100(a)(3)).
- Commercial refrigeration: a licensee with that endorsement may install control wiring of any voltage on the equipment side of the disconnect installed for that purpose (16 TAC §75.100(a)(3)).
- Component parts: replacement and reconnection are allowed for parts of the same or lesser amperage, not greater; a missing required disconnect may be installed (16 TAC §75.100(a)(2)).
Sample questions (5)
1. A gas furnace with an induced-draft inducer receives a call for heat. The inducer runs, but the ignitor never glows and the gas valve never opens. Assume the limit and rollout switches are closed. What is the MOST likely cause?
- A flame sensor that is coated with oxide deposits
- A 24-volt control transformer that has failed open
- A blower relay that fails to energize on the call
- An inducer pressure switch that has failed and stays open
On a call for heat, the control board waits for the inducer pressure switch to close and prove draft before it energizes the ignitor and gas valve, so a switch that stays open stops the sequence after the inducer starts. A coated flame sensor matters only after ignition, a failed 24-volt transformer would prevent the call for heat and the inducer start, and the blower relay is not part of the pre-ignition path.
2. A control transformer has a 120-volt primary and a 24-volt secondary and is rated 40 VA. Rounding to two decimal places, what is the maximum current the secondary can supply?
- 0.33 A
- 0.60 A
- 1.67 A
- 5.00 A
Current = VA / volts = 40 VA / 24 V = 1.67 A on the secondary. A result of 0.33 A divides by the 120-volt primary voltage, which gives the primary current instead, 0.60 A inverts the ratio (24 / 40), and 5.00 A divides the primary voltage by the secondary voltage (120 / 24).
3. What is the function of a contactor in a compressor control circuit?
- It uses a low-voltage coil to close heavy contacts that switch compressor power
- It reduces line voltage to 24 volts for the thermostat circuit and control coils
- It stores energy in the run circuit to give the motor extra starting torque
- It senses discharge pressure and opens the control circuit on high pressure
A contactor is a relay-type switch in which a small control coil, usually 24 volts, closes heavier contacts that carry the compressor line-voltage current. Reducing voltage to 24 volts is the job of a control transformer, storing energy for torque is the job of a capacitor, and sensing discharge pressure is the job of a high-pressure switch.
4. Under 16 TAC §75.100(a)(3), apart from the commercial refrigeration endorsement exception, a licensee may install and service control wiring of how many volts or less?
- 24 volts or less
- 50 volts or less
- 120 volts or less
- 240 volts or less
16 TAC §75.100(a)(3) allows a licensee to install and service control wiring of 50 volts or less; any voltage is allowed only for commercial refrigeration control wiring on the equipment side of its disconnect, by a licensee with that endorsement. A 24-volt limit confuses the rule with the usual thermostat-circuit voltage, and 120 and 240 volts are line voltages for equipment power, outside the general control-wiring allowance.
5. Under 16 TAC §75.100(a)(3), which statement about control wiring on a walk-in cooler is correct for a licensee who holds the commercial refrigeration endorsement?
- Wiring of any voltage may be installed on the line side of the disconnect serving it
- Wiring is limited to 50 volts or less, exactly as it is for other equipment
- Wiring up to 120 volts may be installed on either side of the disconnect it serves
- Wiring of any voltage may be installed on the equipment side of the disconnect
16 TAC §75.100(a)(3) lets a licensee with the commercial refrigeration endorsement install control wiring of any voltage, provided the wiring is on the equipment side of the disconnect installed for that purpose. The 50-volt limit applies to control wiring generally, not to endorsed commercial refrigeration work; line-side wiring is not covered; and the rule contains no 120-volt limit or either-side allowance.