TexasHVACExam

🏭 HVACR Systems

What this topic covers

HVACR Systems in the PSI bulletin: components, installation and refrigeration systems. These are original practice notes, not materials of the TDLR or PSI. License scope and installation limits come from Texas Occupations Code ch. 1302 and 16 TAC ch. 75, and the federal rule from 40 CFR part 84, as in force on January 1, 2027; the system content uses standard principles of the trade. The exam is open book: know where each definition and limit sits in your authorized references and what to add up before comparing.

Types of work and license class

Installation limits (16 TAC §75.100)

Heat pump components

Commercial refrigeration controls

Defrost and ice machines

Take the free test · full question bank and mock exams with a subscription

Sample questions (5)

1. Under 16 TAC §75.100(a)(1), which electrical task may a licensee perform on new construction of an environmental air conditioning system?

  1. Install a new branch circuit from the service panel to the appliance location
  2. Replace the panel breaker with one of a higher amperage rating for the unit
  3. Extend the utility service conductors to the meter base serving the building
  4. Connect the appliance to the electrical line or disconnect provided for it

16 TAC §75.100(a)(1) allows a licensee, on new construction, to connect the appliance to the electrical line or disconnect that is provided for that purpose. The rule grants only that connection: a new branch circuit, a higher-amperage breaker, and utility service conductors are not named in it. Replacement work is handled separately in §75.100(a)(2).

2. Lone Star Cold Storage Services holds a Class B license with a commercial refrigeration and process cooling or heating endorsement. Its crew installs 120-volt control wiring for the evaporator fan relays of a walk-in cooler, entirely on the equipment side of the disconnect. Under 16 TAC §75.100(a)(3), is this work permitted?

  1. Yes; commercial refrigeration control wiring of any voltage is allowed on the equipment side of the disconnect
  2. No; the rule limits licensees to control wiring of 50 volts or less on commercial refrigeration equipment
  3. No; control wiring above 50 volts requires the environmental air conditioning endorsement on the license
  4. Yes; but the wiring must be installed on the line side of the disconnect that serves the walk-in cooler

16 TAC §75.100(a)(3) lets a licensee install control wiring of 50 volts or less, and lets a licensee with the commercial refrigeration endorsement install commercial refrigeration control wiring of any voltage as long as it is on the equipment side of the disconnect. The 50-volt limit therefore does not cap this job. The environmental air conditioning endorsement is not the one that governs commercial refrigeration wiring, and the line side of the disconnect is outside the allowance.

3. Under 16 TAC §75.100(b)(1), fuel gas piping installed by a licensee for a new or replaced system is limited to the piping between which two points?

  1. The gas meter and the first shut-off valve located upstream of the appliance
  2. The appliance and the existing piping system, at an existing shut-off valve
  3. The utility service line and the existing piping system inside the building
  4. The appliance and the gas meter, including any shut-off valve changes needed

16 TAC §75.100(b)(1) limits a licensee's fuel gas piping to the portion between the appliance and the existing piping system, connected at an existing shut-off valve provided for such use. Work that starts at the meter or the utility service line goes beyond that portion. The same paragraph says existing piping systems, stops, and shut-off valves shall not be altered by a licensee.

4. A licensee is replacing a gas furnace and needs new fuel gas piping. Which action is NOT allowed under 16 TAC §75.100(b)(1)?

  1. Installing piping between the furnace and an existing shut-off valve
  2. Connecting the new piping at an existing shut-off valve provided for the purpose
  3. Altering an existing shut-off valve so that the new piping run is shorter
  4. Replacing the old furnace piping downstream of the existing shut-off valve

16 TAC §75.100(b)(1) says existing piping systems, stops, or shut-off valves shall not be altered by a licensee, so changing a valve to shorten the run is not allowed. The other three actions are permitted: fuel gas piping for a new or replaced system may be installed by a licensee, limited to the portion between the appliance and the existing piping system and connected at an existing shut-off valve, so replacing the old piping downstream of that valve is within the limit.

5. A heat pump has a TXV at the indoor coil and another TXV at the outdoor coil. In the cooling mode, how does liquid leaving the outdoor coil reach the indoor TXV without passing through the outdoor TXV?

  1. Through a check valve piped around the outdoor TXV, open in that direction
  2. Through the reversing valve, which reroutes the liquid line around the TXV
  3. Through the suction accumulator, which sends the liquid to the indoor coil
  4. Through the TXV external equalizer line, which carries liquid past it

When each coil of a heat pump has its own TXV, a check valve is piped in parallel with each TXV: it opens when liquid flows away from its coil and closes in the other mode so that the TXV meters. In cooling, the check valve around the outdoor TXV passes the liquid on to the indoor TXV. The reversing valve switches only the compressor discharge and suction vapor connections, not the liquid line; the accumulator sits in the suction line to protect the compressor from liquid; and the external equalizer line only senses evaporator outlet pressure for the TXV, so it carries no liquid flow.

Start free

TexasHVACExam · Topics · Exam guide · Sample questions